Tuesday, February 25, 2020

Jarred Week 2

The Project Continued......

Me and Zach continue working on the camper and dealing with all the problems that come along with it

The main goal is to remove the engine, so you have to remove all pipes/electrical components/other components such as the air filter.
Friday was the removal of the coolant that was left over from the camper.

Monday was when we worked on the bottom of the camper by removing or disassembling
 tubes and pipes that were connected to the engine.

Tuesday is when all the components that were neatly put aside on a moving cart, it to be stored into the camper for use after the new engine is installed. Laying down a tarp on the floor of the camper was to prevent dirty, coolant, and hardened exhaust from dirtying the floor.

No comments:

Post a Comment